jeudi 5 octobre 2017

Spacewalkers Wrap Up Robotic Arm Work














ISS - Expedition 53 Mission patch / EVA - Extra Vehicular Activities patch.

October 5, 2017

Expedition 53 Commander Randy Bresnik and Flight Engineer Mark Vande Hei of NASA completed a 6 hour, 55 minute spacewalk at 3 p.m. EDT. The two astronauts replaced one of two Latching End Effectors (LEE) on the station’s robotic arm, Canadarm2.

They also accomplished a couple of get-ahead tasks, including removal of the multi-layer insulation from a spare direct current switching unit. They also prepared a flex hose rotary coupler for future use.

This was the first of three spacewalks planned for October. Bresnik will lead the next two, as well. Vande Hei will join him again Oct. 10 with Flight Engineer Joe Acaba joining him Oct. 18.


Image above: Spacewalkers Mark Vande Hei and Randy Bresnik work on installing a new latching end effector on the tip of the Canadarm2 robotic arm. Image Credit: NASA TV.

The second and third spacewalks will be devoted to lubricating the newly installed end effector and replacing cameras on the left side of the station’s truss and the right side of the station’s U.S. Destiny laboratory.

Today’s spacewalk was the third for Bresnik’s career and the first for Vande Hei. The Oct. 18 spacewalk will mark the third of Acaba’s career.

Related links:

Expedition 53: https://www.nasa.gov/mission_pages/station/expeditions/expedition53/index.html

Space Station Research and Technology: https://www.nasa.gov/mission_pages/station/research/index.html

International Space Station (ISS): https://www.nasa.gov/mission_pages/station/main/index.html

Image (mentioned), Text, Credits:  NASA/Mark Garcia.

Best regards, Orbiter.ch