NASA - ARTEMIS-1 Mission patch.
April 25, 2022
At approximately 5:30 p.m. ET today, NASA’s Artemis I Moon rocket atop the crawler-transporter is scheduled to leave launch pad 39B and begin its 4-mile trek to the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida.
Image above: Crawler-transporter 2 (CT-2) makes its way along the crawlerway to Launch Complex 39B at NASA’s Kennedy Space Center in Florida. In view atop the mobile launcher on the pad are the Artemis I Space Launch System (SLS) and Orion spacecraft. Image Credits: NASA/Ben Smegelsky.
Once inside the VAB, teams will work on replacing a faulty upper stage check valve and a small leak within the tail service mast umbilical ground plate housing on the mobile launcher while the supplier for the gaseous nitrogen makes upgrades to their pipeline configuration to support Artemis I testing and launch. Following completion, teams will return to the launch pad to complete the next wet dress rehearsal attempt.
Image above: A SpaceX Falcon 9 rocket carrying a batch of the company's Starlink internet satellites lifts off from Launch Complex 40 at Cape Canaveral Space Force Station in Florida, on April 21, 2022. On the right, NASA’s Space Launch System rocket with the Orion spacecraft aboard sits atop a mobile launcher at Launch Complex 39B at Kennedy Space Center, while on the left at Kennedy Space Center’s Launch Complex 39A is a SpaceX Falcon 9 rocket with the company's Crew Dragon spacecraft, as preparations continue for the agency’s Crew-4 mission to the International Space Station. Image Credits: NASA/Kim Shiflett
Related articles:
Artemis I WDR Update: Teams Working Solution to Continue Propellant Loading Operations
https://orbiterchspacenews.blogspot.com/2022/04/artemis-i-wdr-update-teams-working.html
Artemis I Update: Countdown is Underway for Wet Dress Rehearsal
https://orbiterchspacenews.blogspot.com/2022/04/artemis-i-update-countdown-is-underway.html
NASA Prepares for Next Artemis I Wet Dress Rehearsal Attempt
https://orbiterchspacenews.blogspot.com/2022/04/nasa-prepares-for-next-artemis-i-wet.html
Artemis I WDR Update: Go to Proceed for Tanking – Countdown Resumes
https://orbiterchspacenews.blogspot.com/2022/04/artemis-i-wdr-update-go-to-proceed-for.html
NASA ‘Go’ for Artemis I Wet Dress Rehearsal
https://orbiterchspacenews.blogspot.com/2022/03/nasa-go-for-artemis-i-wet-dress.html
Standing tall: Moon rocket milestone for Artemis
https://orbiterchspacenews.blogspot.com/2022/03/standing-tall-moon-rocket-milestone-for.html
NASA Readies Rocket for Artemis I Wet Dress Rehearsal
https://orbiterchspacenews.blogspot.com/2022/03/nasa-readies-rocket-for-artemis-i-wet.html
Related links:
Artemis I: https://www.nasa.gov/artemis-1
Space Launch System (SLS): https://www.nasa.gov/exploration/systems/sls/index.html
Orion spacecraft: https://www.nasa.gov/exploration/systems/orion/index.html
Images (mentioned), Text, Credits: NASA/Madison Tuttle.
Best regards, Orbiter.ch